Practical tools

Compare costs. Check readiness.

Browser-based worksheets for crude costs, LNG-to-Power projects, finance documents and project evidence. Inputs are not sent to a server.

Tool 01 · Crude oil

Crude oil landed-cost calculator

Compare candidate cargo costs in the same currency and on the same delivery basis. Refining yields, taxes and quality adjustments require a separate model.
Estimated landed cost$76.70per barrel
Total cargo value
$76,700,000
Adjustments to benchmark
$1.70/bbl

The result is an arithmetic sum of your inputs. Separately record whether it includes the contractual pricing period, exchange rates, yields, demurrage, taxes and regulatory costs.

Tool 02 · LNG-to-Power

Readiness check across 7 workstreams

0 = unverified; 1 = assumptions only; 2 = draft or under discussion; 3 = approved evidence and an assigned owner.
Readiness score0%

Many core assumptions remain. Establish the evidence and responsible parties before proposing an FID date.

Tool 03 · Finance

Finance data-room checklist

Mark an item complete only when you have the current approved documents, an assigned owner and traceable sources for model inputs.
Evidence groups ready0/8

Tool 04 · Project development

Project evidence check: 8 areas

Distinguish a concept from a project ready to proceed. 0 = unverified; 1 = assumptions or indirect evidence; 2 = draft or conditional evidence; 3 = current original records and an identified owner.
Evidence readiness0%

8 areas rely on assumptions. Confirm authority and obtain original records before proposing a schedule or projected returns.

0 Unverified1 Assumptions / indirect evidence2 Draft / conditional evidence3 Current originals / owner