SBLC and Demand Guarantee Calls: URDG 758 vs ISP98 vs UCP 600, Step by Step

A demand is paid when it matches the instrument, not when the claim is fair. Know which rules apply, build the demand backwards from expiry and check every refusal notice.

Questions this guide addresses

  • How do you tell from the wording whether URDG 758, ISP98 or UCP 600 governs a demand?
  • What must a complying demand contain, and how long does the bank have to pay or refuse?
  • Why are demands refused, and what can a beneficiary do before expiry after a refusal?
  • What can an applicant do when a demand arrives, and how do you spot a leased SBLC scam?
Method and verification scope
  • Article and rule numbers were checked against the URDG 758, ISP98 and UCP 600 texts in the ICC Digital Library, the ICC Guide to URDG 758 and ICC's 2020 guidance paper on 24 October 2026.
  • Practical points on refusals and drafting reflect patterns PentaBay sees in trade and project files, described in general terms; no real counterparty, bank, amount or outcome is referred to.
  • SWIFT message descriptions come from an industry publication; confirm current formats with your bank. Fraud warnings come from the SEC, the US Treasury and ICC.
  • This is general information, not legal or financial advice. Outcomes depend on the instrument text and the governing law; take advice from qualified counsel on specific cases.
Editorial policy and corrections

01 · Basics

The bank pays against a document, not against the facts of your contract

A standby letter of credit (SBLC) and a demand guarantee do the same economic job. A bank promises to pay the beneficiary when a demand that matches the instrument's terms is presented before expiry. In commodity trade they usually secure payment for a cargo or performance of a supply contract. In EPC projects they appear as bid bonds, advance payment guarantees, performance guarantees and warranty bonds. The label on the paper matters less than two questions: which rules the instrument says it is subject to, and exactly what it asks the beneficiary to present.

All three ICC rule sets start from independence. URDG 758 Article 5 says a guarantee is by its nature independent of the underlying relationship and that the guarantor is in no way concerned with or bound by that relationship. ISP98 Rule 1.06 treats a standby as independent, and Rule 1.08 says the issuer is not responsible for performance or breach of the underlying transaction. UCP 600 Article 4 says banks are in no way concerned with or bound by the sale or other contract. In practice the bank does not ask whether the cargo really arrived late or the plant really failed its test. It asks whether the demand and documents look like what the instrument requires.

That cuts both ways. A beneficiary with a strong contractual case can still be refused because of a weak demand. An applicant who is clearly not in breach usually cannot stop payment of a complying demand by arguing the contract with the bank; its protection lies mainly in the wording agreed before issue and in a narrow fraud or abuse exception that the rules leave to national law. PentaBay's view is that a guarantee should be managed as a separate payment instrument with its own file, deadlines and owner, not filed as an annex to the contract.

Sources [1][2][3][5]

02 · Rule set

The incorporation sentence, not the instrument's name, decides which rules apply

None of these rule sets applies automatically. URDG 758 Article 1(a) applies to a guarantee or counter-guarantee that expressly indicates it is subject to the URDG. UCP 600 Article 1 applies to a credit, including a standby to the extent the rules may be applicable, when its text expressly says it is subject to UCP 600. ISP98 was written for standbys only and is not meant for commercial documentary credits. If an instrument names no rules at all, the issuer's obligations depend on the governing law alone, and that varies widely between Korea, the Gulf states and African jurisdictions.

Read the undertaking text, not the cover letter or the broker's summary. Find the subject-to sentence, then look for modifications such as an express exclusion of the URDG supporting statement or the words partial drawings prohibited. Check the governing-law and jurisdiction clause. In Middle East and African projects a local bank often issues the guarantee against a counter-guarantee from the Korean bank, and the two instruments may carry different rules, expiry dates and laws. A pattern we see often is draft wording that cites one rule set but uses the vocabulary of another, or still refers to a superseded edition such as URDG 458 or UCP 500. Fix that before the instrument is issued; at demand stage it becomes an argument.

Reading the incorporation clause: what the wording says and what to check first
Wording in the instrumentRules governing the demandWhat to check first
Subject to URDG 758URDG 758, as modified by the instrument's own termsWhether the Article 15 supporting statement is expressly excluded; place and channel of presentation; any governing law that displaces Article 34
Subject to ISP98ISP98Exact demand wording and any statement of default the standby requires; any change to the Rule 3.14 closure extension; any shortened notice period
Subject to UCP 600 (standby)UCP 600, to the extent applicable to a standbyStipulated documents; restrictions on partial drawings (Article 31(a) allows them by default); Article 36 risk at expiry
Two rule sets namedUnclear; likely disputeAsk the issuer to correct before acceptance; do not rely on the reading that suits you
No rules namedGoverning law onlyLocal law on independence, expiry and fraud; ask for an express incorporation clause
Superseded edition (URDG 458, UCP 500)The edition named, as incorporatedRequest the current edition; time limits and requirements differ between editions

Rule references from the ICC Digital Library texts of URDG 758, ISP98 and UCP 600.

Sources [1][2][3][6]

03 · Comparison

URDG 758, ISP98 and UCP 600 differ exactly where demands go wrong

The table compares the points that decide whether a demand is paid: how long the bank has to examine, what the refusal notice must contain, whether a supporting statement is needed, how partial and repeated demands work, what happens with extend-or-pay requests, and what happens if the bank is closed at expiry. Every reference was checked against the rules text in the ICC Digital Library. Each rule can be modified by the instrument itself, so the instrument always comes first.

Three differences matter most in practice. First, URDG 758 requires a statement of breach unless the guarantee expressly excludes it, while ISP98 and UCP 600 require only what the standby itself asks for. Second, the clock differs: five business days under URDG 758, a reasonableness test with three and seven business-day markers under ISP98, and five banking days under UCP 600. Third, closure at expiry: URDG 758 and ISP98 both give a 30 calendar day extension in their own terms, but UCP 600 Article 36 says a bank will not honour a credit that expired during an interruption of its business. For a standby that may be drawn in a region exposed to disruption, that last point alone is a reason to prefer ISP98 or URDG 758.

Key demand rules compared (article and rule numbers as verified in the ICC texts)
PointURDG 758ISP98UCP 600 (standby)
Time to examine and refuseArt. 20(a): examine within five business days after presentation. Art. 24(e): rejection notice no later than the close of the fifth business day after presentationRule 5.01(a): notice of dishonour within a time that is not unreasonable; within three business days is deemed not unreasonable, beyond seven business days is deemed unreasonableArt. 14(b): maximum five banking days following presentation. Art. 16(d): refusal notice by the close of the fifth banking day
Refusal notice and preclusionArt. 24(d): a single notice stating rejection and each discrepancy. Art. 24(f): failure precludes the guarantor from claiming non-complianceRule 5.02: state all discrepancies. Rule 5.03(a): failure to give timely notice precludes asserting that discrepancyArt. 16(c): a single notice. Art. 16(f): issuing or confirming bank precluded if it does not follow Art. 16
Supporting statementArt. 15(a): statement by the beneficiary indicating in what respect the applicant is in breach; may be in the demand or separate. Art. 15(c): required unless expressly excludedNo general requirement; only statements the standby itself requiresNo rule requires one; only the documents the credit stipulates
Form of the demandDemand supported by the Art. 15 statement and any documents the guarantee specifiesRule 4.16(b): a separate demand contains a demand for payment directed to the issuer or nominated person, a date, the amount and the beneficiary's signatureNo separate demand required by the rules; documents as stipulated in the credit
Partial and multiple demandsArt. 17(a)-(b): both allowed. Art. 17(c): multiple demands prohibited means one demand. Art. 17(d): after a rejected demand, another may be made before expiry. Art. 17(e): a demand above the available amount is non-complyingRule 3.08(a)-(b): presentations for less than the full amount and multiple presentations allowedArt. 31(a): partial drawings allowed. Art. 32: a missed instalment ends availability for that and later instalments
Extend or payArt. 23: guarantor may suspend payment up to 30 calendar days; counter-guarantor four calendar days less; demand deemed withdrawn if the extension is grantedRule 3.09: a request to extend or pay is a presentation demanding payment and is examined as suchNo specific article
Closure or force majeure at expiryArt. 26(b): guarantee extended by 30 calendar days if it expires while force majeure prevents presentation or paymentRule 3.14(a): if the place of presentation is closed on the last business day, automatic extension to 30 calendar days after it reopens, unless the standby provides otherwiseArt. 36: no honour of a credit that expired during the interruption. Art. 29(a): ordinary closure moves expiry to the next banking day
Information to the applicant sideArt. 16: guarantor must inform the instructing party (or counter-guarantor) of a demand without delayNo equivalent duty in the rules reviewed here; Rule 5.09(a) requires the applicant to object in time to honour of a non-complying presentationNo express duty in the articles reviewed here
Fraud and abusive callsNot dealt with; left to the applicable law (ICC Guide to URDG 758)Rule 1.05(c): the rules do not provide defences based on fraud, abuse or similar mattersNot addressed; governing law
Governing law and forumArt. 34(a): law of the location of the guarantor's issuing branch unless stated otherwise. Art. 35(a): exclusive jurisdiction of the courts thereNo choice-of-law rule; Rule 1.02(a): the rules supplement the applicable lawNo governing-law article; state it in the credit

Checked on 24 October 2026 against the ICC Digital Library texts. URDG 758 Art. 25(c) also provides that a guarantee with no expiry date or event terminates three years after issue.

Sources [1][2][3][4][5]

04 · Procedure

A complying demand is built backwards from the expiry date

The safest demands we have seen were prepared as if they would be rejected once. That means presenting early enough that a refused demand can be corrected and re-presented before expiry, which both URDG 758 Article 17(d) and ISP98 Rule 3.08(b) allow. The ICC Guide to URDG 758 notes that a rejected demand does not count against a limit on the number of demands. A demand sent on the last day leaves no room for that second attempt.

Delivery is part of compliance. URDG 758 Article 14 requires presentation to the guarantor at the place of issue or another place the guarantee specifies, on or before expiry; where electronic presentation is allowed the guarantee should state the format, system and electronic address. ICC's 2020 guidance paper points out that under Article 10(c) an advising party has no obligation to forward a beneficiary's demand to the guarantor. Sending the demand to the bank that advised the guarantee is therefore not the same as presenting it.

SWIFT messages you are likely to meet around a demand
MessageWhat it carriesPractical point
MT 760Details of an undertaking (demand guarantee or standby)The sender may be the issuer or a bank passing the undertaking on; check the role. The undertaking text is what your demand must match
MT 767Amendment to an undertakingKeep every amendment and read the terms as amended before drafting
MT 765Demand for payment under an undertaking; may include a request to extend the expiry dateUsed when the demand is presented bank to bank; the demand must still meet the instrument and its rules
MT 799Free-format correspondence between banksPentaBay view: correspondence alone does not show that an undertaking exists; confirm the issued terms with the issuer

Message descriptions from Trade Finance Global (2023). SWIFT revised its guarantee messages in recent standards releases; confirm current formats with your bank.

  1. Open the file: the issued instrument and every amendment, the rule set, expiry date and any expiry time and place, amount still available after reductions, required documents, place and channel of presentation, and language.
  2. Check the trigger in the underlying contract. The bank will not test it, but a call made in breach of contractual notice or cure provisions can expose the beneficiary to a claim under the contract or the governing law. Take advice where the facts are contested.
  3. Draft the demand to mirror the instrument: issuer, instrument reference, beneficiary name exactly as written, amount and currency within the available amount, and any wording the instrument prescribes.
  4. Under URDG 758, add the Article 15(a) statement saying in what respect the applicant is in breach, unless the guarantee expressly excludes it. Keep it factual and short; add no conditions.
  5. Assemble every document the instrument names, in the form named. If signatures must be authenticated by a bank, arrange that early.
  6. Choose the channel the instrument allows: paper at the stated place, the stated electronic system, or presentation through your bank by SWIFT. Confirm with your bank how the demand and statement will be carried.
  7. Present with a margin of working days before expiry and keep proof of delivery with date and time.
  8. Track the bank's clock: five business days under URDG 758, the three and seven business-day markers under ISP98, five banking days under UCP 600. For an extend-or-pay demand under URDG 758, expect a possible suspension of up to 30 calendar days.
  9. On payment, reconcile the reduced amount. On refusal, read the notice at once and decide whether to cure and re-present before expiry.

Sources [1][2][4][5][7]

05 · Refusals

Most refusals come from five avoidable errors, and the refusal itself must comply

The list below reflects patterns we see in trade and project files and in published ICC commentary. None of these is about the merits of the underlying claim. Each is about the demand failing to match the instrument.

1. Missing or weak supporting statement

Under URDG 758 the statement must indicate in what respect the applicant is in breach. A demand that only says payment is due, or attaches the contract and invoices instead of a statement, invites rejection. If the guarantee prescribes exact wording, use it word for word.

2. Wrong place or channel

Demands sent to the advising bank, to a branch not named in the instrument, or by e-mail when the instrument requires paper or a SWIFT presentation. Delivery to the wrong address is not presentation.

3. Late arrival

Demands that leave on the expiry date but arrive the next day, or arrive after the stated hour, or ignore that expiry is counted at the place of presentation. Courier delays and public holidays at the issuer's location are the usual causes.

4. Amount, currency or reference mismatch

Claiming the original face value after reductions, mixing currencies, or quoting the wrong instrument number. Under URDG 758 Article 17(e) a demand above the available amount is non-complying.

5. Documents not as specified

Missing documents, signatures not authenticated where required, a beneficiary name that differs from the instrument, or documents in another language than the instrument requires (ISP98 Rule 4.04 points to the language of the standby).

Sources [1][2][3][4][6]

06 · Applicant

The applicant's leverage lies in the wording and in the first few business days

When a demand arrives the guarantor examines it on its face against the instrument and the rules. Under URDG 758 Article 16 the guarantor must inform the instructing party, usually the applicant or a counter-guarantor, without delay. The applicant cannot block payment of a complying demand simply because it disputes the breach. It may be asked whether it will waive discrepancies; a waiver is a business decision, and it should not be given reflexively. Under ISP98 Rule 5.09(a) an applicant who wants to object to honour of a non-complying presentation must do so in time.

Fraud and abusive calls are outside the rules. The ICC Guide to URDG 758 says fraud is a matter for the applicable law, and ISP98 Rule 1.05(c) says the rules do not provide defences based on fraud, abuse or similar matters. Standards differ by country, and courts generally intervene only in narrow cases on clear evidence. The 1995 UN Convention on Independent Guarantees and Stand-by Letters of Credit, in force since 1 January 2000, deals with these questions but applies only where a relevant state is a party. Timing is the practical problem: the bank's examination window is measured in business days, so evidence and local counsel must be ready before a call is expected, not after it arrives.

Read the demand against the instrument

Compare the demand with the issued text and amendments, not with your view of the contract. Note any discrepancy and tell the bank in writing quickly.

Separate the payment from the dispute

Payment of a complying demand does not decide who is right under the contract. Preserve your contractual claim for recovery under the contract's own dispute clause.

Use the extend-or-pay window

Under URDG 758 Article 23 the guarantor may suspend payment for up to 30 calendar days. That is time to negotiate an extension or a settlement, not a defence.

Map the counter-guarantee chain

Where a local bank issued against your bank's counter-guarantee, two instruments, two expiry dates and possibly two governing laws are in play. Know both.

Take jurisdiction-specific advice early

Whether an injunction or similar measure is available, and on what evidence, depends on the governing law and the courts concerned. This guide does not give that advice.

Sources [1][2][4][12]

07 · Before you demand

Twelve checks before a demand leaves your office

Use this list on the day you decide to call, and again on the day you send. Each item has caused a refusal in practice somewhere.

  • We hold the issued instrument as received from the issuer, and every amendment.
  • We have confirmed which rules apply and any article the instrument excludes or modifies.
  • Expiry date, time and place are written in the file, with local public holidays checked.
  • The amount demanded is within the amount still available after any reductions.
  • Currency, instrument reference and beneficiary name match the instrument exactly.
  • Under URDG 758, the statement of breach is included unless expressly excluded.
  • Any wording the instrument prescribes is copied exactly.
  • Every required document is attached, signed and, where required, authenticated.
  • The channel and address of presentation are the ones the instrument names.
  • There is enough time before expiry to cure and re-present after a refusal.
  • The contractual notice or cure steps that precede a call have been followed or reviewed with counsel.
  • One named person owns the file, the delivery evidence and the bank's response deadline.

Sources [1][2][3]

08 · Before you issue or accept

Most demand disputes are won or lost when the wording is agreed

Applicants and beneficiaries both gain from wording that is unambiguous. For EPC suppliers the issues are usually expiry, reduction and the supporting statement. For commodity sellers holding an SBLC as payment security they are usually the documents required, the place of presentation and closure at expiry. Review the wording against this list before the instrument is issued or accepted.

  • One current rule set is named (URDG 758, ISP98 or UCP 600) and no other rules are mixed in.
  • Any exclusion or modification of a rule is stated expressly, for example of the URDG 758 Article 15 statement.
  • The expiry is a fixed date or a documentary event that can be determined from documents, not an undocumented fact.
  • Place and channel of presentation are stated, including any electronic format, system and address.
  • The demand content is specified, with an annexed form of demand where possible.
  • Partial and multiple demands are addressed deliberately, not by default.
  • Reduction mechanics are documentary and clear (for example against stated documents or certified progress).
  • Governing law and forum are stated, or the default under URDG 758 Articles 34 and 35 is understood and accepted.
  • Where a counter-guarantee is involved, the expiry of the counter-guarantee leaves room after the guarantee's expiry.
  • Closure at expiry is addressed; under UCP 600 consider adding wording, given Article 36.
  • The issuer is a regulated bank that you or your bank can verify directly, and the instrument will arrive through a bank channel.

Sources [1][2][3][4]

09 · Fraud warnings

Nobody leases you a genuine SBLC to fund your trade

Offers to lease or monetise an SBLC or bank guarantee for an upfront fee reach commodity traders regularly. In a 2013 case the US Securities and Exchange Commission described investors being told their payments would cover bank charges to lease a 10 million euro standby letter of credit that would fund a trading programme; the SEC said the scheme was fraudulent. The US Treasury's TreasuryDirect fraud page lists standby letters of credit and bank-endorsed guarantees among the phrases used in prime bank fraud, and states that claims of approval by the Treasury, the Federal Reserve, the IMF or the ICC are false.

The ICC's Financial Investigation Bureau warned in 2004 that the ICC has never published rules on non-circumvention and non-disclosure agreements, and that guarantees are not negotiable, assignable or transferable unless their terms say so. In 2015 ICC's DC World News reported a Korean supervisory warning after a purported 50 million euro standby L/C, offered as repayment security for a Korean trading company, turned out not to have been issued by the named bank. Genuine instruments are issued for an applicant that has credit lines with the issuer, for a specific underlying transaction. They are not rented.

Upfront fee to lease or monetise

A fee to lease an SBLC, or a promise that a third party will monetise or discount it into cash, is the core pattern regulators describe.

Fixed odd tenors and transfer claims

One year and one day, divisible, assignable and transferable: ICC FIB lists these as red-flag terms.

ICC rules that do not exist

References to ICC rules on non-circumvention and non-disclosure, or to ICC approval of a programme.

A promise of contact you cannot make

Contracts that forbid you to contact the issuing bank, or verification only through a phone number or website supplied by the offeror.

Pre-advice instead of an instrument

A free-format message or a screenshot in place of an undertaking delivered through your own bank.

Sources [8][9][10][11]

Practical takeaways

  1. Read the incorporation sentence and every amendment first; the rules and the instrument's own terms decide what a complying demand is.
  2. Under URDG 758, include a statement of breach unless the guarantee expressly excludes it.
  3. Present to the issuer at the stated place and channel, early enough to cure and re-present before expiry.
  4. Check that a refusal notice is timely and lists every discrepancy; then fix and re-present rather than argue the contract with the bank.
  5. Treat any offer to lease or monetise an SBLC for a fee as fraud until your own bank verifies otherwise.

Sources and further reading

Source titles are preserved in their original language. Figures retain the reference period stated by each source.

  1. International Chamber of Commerce (ICC Digital Library) ICC Uniform Rules for Demand Guarantees (URDG 758), rules text ↗ (opens in a new tab)

    Articles 1, 5, 14, 15, 16, 17, 20, 23, 24, 25, 26, 34 and 35 checked against this text.

    Published / revised 2010 · Accessed 2026-10-24
  2. International Chamber of Commerce (ICC Digital Library) International Standby Practices (ISP98), rules text ↗ (opens in a new tab)

    Rules 1.02, 1.05, 1.06, 1.08, 3.08, 3.09, 3.14, 4.16, 5.01, 5.02, 5.03, 5.06 and 5.09 checked against this text.

    Published / revised 1998 · Accessed 2026-10-24
  3. International Chamber of Commerce (ICC Digital Library) Uniform Customs and Practice for Documentary Credits (UCP 600), rules text ↗ (opens in a new tab)

    Articles 1, 14(b), 16(c), 16(d), 16(f), 29(a), 31(a), 32 and 36 checked against this text.

    Published / revised 2007 · Accessed 2026-10-24
  4. International Chamber of Commerce (ICC Digital Library) Guide to ICC Uniform Rules for Demand Guarantees URDG 758, Chapter 3 ↗ (opens in a new tab)

    ICC commentary on presentation, supporting statements, rejection, extend-or-pay and force majeure; notes that fraud is left to the applicable law.

    Accessed 2026-10-24
  5. International Chamber of Commerce Guidance paper on the impact of COVID-19 on trade finance transactions issued subject to ICC rules ↗ (opens in a new tab)

    Quotes UCP 600 Arts 4, 14(b), 16(d), 36; URDG 758 Arts 5, 10(c), 26; ISP98 Rules 1.08, 3.14 and 5.01; explains that an advising party need not forward a demand.

    Published / revised April 2020 · Accessed 2026-10-24
  6. ICC Academy UCP 600 and ISP98: Key differences and applications ↗ (opens in a new tab)

    Used for the scope of UCP 600 for standbys and the ISP98 demand and language points.

    Accessed 2026-10-24
  7. Trade Finance Global How do banks talk to each other and what are the different types of messages used by SWIFT? ↗ (opens in a new tab)

    Describes MT 760 (undertaking details), MT 767 (amendment), MT 765 (demand, may request extension) and MT 799 (free format). Field-level rules must be confirmed in SWIFT documentation through your bank.

    Published / revised 6 March 2023 · Accessed 2026-10-24
  8. U.S. Securities and Exchange Commission SEC Halts Florida-Based Prime Bank Investment Scheme (Press Release 2013-175) ↗ (opens in a new tab)

    Enforcement case built around fees to lease a standby letter of credit.

    Published / revised 9 September 2013 · Accessed 2026-10-24
  9. U.S. Department of the Treasury, Bureau of the Fiscal Service (TreasuryDirect) Prime Bank Fraud ↗ (opens in a new tab)

    Lists red-flag phrases including standby letters of credit and bank-endorsed guarantees, and states that claimed ICC or central bank sanction of such programmes is false.

    Accessed 2026-10-24
  10. International Chamber of Commerce FIB warns of fake bank guarantees ↗ (opens in a new tab)

    ICC Financial Investigation Bureau warning and red-flag terms.

    Published / revised 24 August 2004 · Accessed 2026-10-24
  11. International Chamber of Commerce (DC World News) DC World News item on a Korean supervisory warning about bogus letters of credit ↗ (opens in a new tab)

    Report of a Korean supervisory warning after a fake standby L/C presented as repayment security.

    Published / revised 7 January 2015 · Accessed 2026-10-24
  12. UNCITRAL United Nations Convention on Independent Guarantees and Stand-by Letters of Credit (New York, 1995) ↗ (opens in a new tab)

    Adopted 11 December 1995; entered into force 1 January 2000. Applies only where a relevant state is a party.

    Published / revised 1995 · Accessed 2026-10-24